Malabar X Building Project
CWBW HOME MALABAR HOME
Most of the aft deck framing is in place.
Standing on the aft deck looking forward, temporary framing for the cabin is in place.
Under decks the cabin sole framing begins.
Cody and Justin working on cabin trunk.
Cabin trunk, covering boards and deck framing.
View shows cabin trunk width beams.
Cabin trunk which is bolted through cabin carlin.
NEXT PAGE
Keel/ballast Transom Molds in place First Sheer Plank Putting planks in place Final Planks Interior frame Deck beams Lodging Knee Aft Deck framing in place Decking being sprung on King Plank Prep for caulk The cockpit Varnish Cockpit scupper/Interior Hull ready to paint Preparing the mast Finishing sanding the mast Engine controls/The Bilge/Interior
The trailer Exiting the building Launch Day Sailing on Seneca Lake
Contact: Dennis Montgomery
Cayuga Wooden Boatworks
800.570.5335
6301 Water St. Cayuga, NY 13034 Voice: 315.253.7447
435 Taughannock Blvd. Ithaca, NY 14850 Voice: 607.272.1581 Fax: 607.272.1601
Email: dennis@cayugawoodenboatworks.com
[ Prev ] [ Random ] [ List ] [ Next ]
Webmaster - Web Design & Mgt by ASN Designs
Copyright 2002-2004 Cayuga Wooden Boatworks