Malabar X Building Project

CWBW HOME            MALABAR HOME

 

 

The crane is ready and the straps are secure.

 

 

 

The CWBW crew is on their way up the

inlet to get on board and start her engine.

 

 

 

 

 

 

 

 

Heading for the dock at Ithaca Boating Center until going to Geneva to put her masts in place.

 

 

Setting her down gently in the cold water - May 1, 2002

 

Dennis gives the thumbs up, and all is well as they have

the engine running smoothly and now they make their way

up the inlet - a very happy and satisfied crew.

 

From this point the crew motored her to CWBW shop in Cayuga to finish

working on the mast stepping process.  The masts were stepped in Geneva

and she sailed a glorious day from the top of Seneca Lake to Watkins Glen.
 


 

NEXT PAGE - SAILING ON SENECA LAKE

CWBW HOME         MALABAR HOME

Keel/ballast    Transom    Molds in place    First Sheer Plank    Putting planks in place    Final Planks    Interior frame    Deck beams   Lodging Knee    Aft Deck framing in place    Decking being sprung on   King Plank   Prep for caulk   The cockpit   Varnish   Cockpit scupper/Interior   Hull ready to paint   Preparing the mast    Finishing sanding the mast    Engine controls/The Bilge/Interior

  The trailer    Exiting the building    Launch Day   Sailing on Seneca Lake

 

 

 

Contact:
Dennis Montgomery

Cayuga Wooden Boatworks


800.570.5335


6301 Water St.
Cayuga, NY 13034
Voice: 315.253.7447

435 Taughannock Blvd.
Ithaca, NY 14850
Voice: 607.272.1581
Fax: 607.272.1601


Email: dennis@cayugawoodenboatworks.com

the Boatbuilding Ring - Click to Join
[ Prev ] [ Random ] [ List ] [ Next ]

 

 

Webmaster - Web Design & Mgt by ASN Designs

Copyright 2002-2004 Cayuga Wooden Boatworks