Malabar X Building Project
CWBW HOME MALABAR HOME
The crane is ready and the straps are secure.
The CWBW crew is on their way up the
inlet to get on board and start her engine.
Heading for the dock at Ithaca Boating Center until going to Geneva to put her masts in place.
Setting her down gently in the cold water - May 1, 2002
Dennis gives the thumbs up, and all is well as they have
the engine running smoothly and now they make their way
up the inlet - a very happy and satisfied crew.
From this point the crew motored her to CWBW shop in Cayuga to finish
working on the mast stepping process. The masts were stepped in Geneva
and she sailed a glorious day from the top of Seneca Lake to Watkins Glen.
NEXT PAGE - SAILING ON SENECA LAKE
Keel/ballast Transom Molds in place First Sheer Plank Putting planks in place Final Planks Interior frame Deck beams Lodging Knee Aft Deck framing in place Decking being sprung on King Plank Prep for caulk The cockpit Varnish Cockpit scupper/Interior Hull ready to paint Preparing the mast Finishing sanding the mast Engine controls/The Bilge/Interior
The trailer Exiting the building Launch Day Sailing on Seneca Lake
Contact: Dennis Montgomery
Cayuga Wooden Boatworks
800.570.5335
6301 Water St. Cayuga, NY 13034 Voice: 315.253.7447
435 Taughannock Blvd. Ithaca, NY 14850 Voice: 607.272.1581 Fax: 607.272.1601
Email: dennis@cayugawoodenboatworks.com
[ Prev ] [ Random ] [ List ] [ Next ]
Webmaster - Web Design & Mgt by ASN Designs
Copyright 2002-2004 Cayuga Wooden Boatworks